Our Quality assurance program specifies procedures for all the aspects of manufacturing, fabrication, inspection, testing, and documentation. |
| Two important facets of our quality tradition are rigorous Factory Acceptance Testing and Turnover Documentation Packages that are regarded as the best in the industry. |
| Factory Acceptance Testing (F.A.T): |
The F.A.T demonstrates full functionality and provides reasonable, real, and documented guarantees that equipment will operate properly and safely upon installation at Buyer's site. All test plans are written in a GMP style format. |
| Typical Turnover Package Documentation: |
Weld and Welder Qualifications
Material MTR's
Equipment & I/O Lists
Gasket Certificates
Calibration Certificates
Passivation & Electro-Polish Records
General Arrangement / Isometric Drawings
Electric, Controls & Instrumentation Schematics
Component Literature & Manuals
Weld Maps, Logs, & Inspection Videos |
Additional documentation is possible and we can create custom documentation furnished to customer Vender Documentation Requirement (VDR) protocols. |
Pilot Process Systems
306 Keystone Drive
Telford, PA 18969 |
Phone: 215.453.8010
Fax: 215.453.8015
sales@bioskids.com |